The following are provided for viewing/printing. Hard copies may be obtained at the Municipal Authority Office during normal business hours.
Developers
Rules & Regulations
Rules & Regulations and Specifications for Construction of Sanitary Sewer Lines and Appurtenances (63 pages w/bookmarks, 600k) | |
Appendix A, Specifications | |
Appendix A, Basic Design and Construction Parameter Checklist | |
Appendix A, Table of Contents | |
Appendix A, Parts I through IV | |
Appendix A, Listing of Referenced Standards and Publications | |
Appendix A, Listing of Supplemental Standard Detailed Drawings | |
STANDARD DETAIL DRAWINGS: (individual drawings approx. 250k each) | |
Complete File of All Standard Detail Drawings (35 drawings w/thumbnails, 7.5meg) | |
SD-001, Tench pipe Zone Details | |
SD-002, Pipe Bedding Details | |
SD-003, Trench Backfill through Woods, Fields or other Unimproved Locations (left intentionally blank) | |
SD-004, Trench Backfill within Roadway or Street Berms | |
SD-005, Trench Backfill and Pavement Placement Requirements for Township Roads | |
SD-006, Desired Distances Between Water and Sewer pipes | |
SD-007, Gravity Sewer and Force Main Constructed Parallel in Common Trench | |
SD-008, Steel Casing and D.I. or PVC Carrier Pipes Installed by Boring | |
SD-009, Steel Casing and D.I. or PVC Carrier Pipes Installed by Boring (left intentionally blank) | |
SD-010, Precast Concrete Manhole for Sewers 8″ to 18″ | |
SD-010a, Manhole Joint Encapsulation System | |
SD-011, Precast Concrete Manhole for Sewers 24″ to 42″ | |
SD-012, Precast Manhole Base Detail | |
SD-013, Manhole for Sewers for Depths Greater than 5 Feet | |
SD-014, Manhole Connection for PVC Pipe (Precast Base) | |
SD-015, Manhole Connection for PVC Pipe (Cast-in-place Base) | |
SD-016, Outside Manhole Drop Connection | |
SD-017, Inside Manhole Drop Connection | |
SD-018, Standard Cast Iron Manhole Frame and Cover | |
SD-019, Watertight Manhole Frame and Cover | |
SD-020, Manhole Inflow Protector | |
SD-021, Polypropylene Plastic Manhole Step | |
SD-022, Service Line Connections | |
SD-023, Typical Service Lateral Connections | |
SD-024, Service Connections | |
SD-025, Service Connection to Sanitary Sewer from a New Installation | |
SD-026, Building Sewer Trap Details | |
SD-027, Small Diameter Force Main Connection | |
SD-028, Concrete Anchors and Methods of Laying Mains Under Obstructions | |
SD-029, Concrete Thrust Blocking | |
SD-030, Sewage Air and Vacuum Release Valve and Manhole | |
SD-031, Precast Concrete Manhole Vault | |
SD-032, Concrete Anchors for Pipelines | |
SD-033, Pipe Support Piers for Alignments above Original Undisturbed Ground or Uncontrolled Fill Areas | |
SD-034, On Line and End Line Cleanout for 6″ and 8″ PVC Sewer | |
SD-035, Site Tee / Cleanout in Paved Areas | |
Appendix B, Pretreatment Regulations of the Allegh. County Sanitary Authority | |
Appendix C, Requirements for Sanitary Sewer Service Line and Sewer Service Connections (see Standard detail Drawings 025, 026, 035 above) | |
Appendix D, Development of Sewer Tap-In and Connection Fees | |
Appendix G, Enforcement Resolution | |
Appendix H, Right to Know/Open Record Resolution & Records Retention Resolution | |